Standard SOP
10-Step Standard Delivery Process
Strictly following our build and content guidelines for an efficient, transparent project.
01
Requirements & Contract Pre-Project
Define scope, UI direction, and features; sign the agreement.
💡 Suggested deliverables:
• Sitemap (home, product pages, etc.)
• Content layout (draft or reference)
• Style references
• Sitemap (home, product pages, etc.)
• Content layout (draft or reference)
• Style references
02
Site Build 7-14 Working Days
- DNS & server setup
- Full desktop build
- Backend & configuration
03 & 04
First Review & Refinement
First review: Confirm structure and direction. Raise major changes at this stage.
Two refinement rounds: After structure sign-off we do two focused edit rounds. Best to batch feedback.
05
Mobile Responsive
After desktop is locked, we optimize for phone and tablet so the site works great on all devices.
06 & 07
Handover & Content
📘 We provide:
Tutorial (video/docs), content upload support.
✍️ You:
Upload products, update news, edit banners per the tutorial.
Professional Checklist
08
Pre-Launch Tech
Security
SSL / HTTPS
Performance
CDN / cache
SEO Base
Sitemap / Robots
Tracking
GTM / GA4
09-10
Final Sign-Off & Support
Hand over all access; run payment tests. After final confirmation, pay the balance and start a 3–6 month support period (including technical fixes).